Transportation Engineering Software Development

NCHRP Project 22-27—  Update of RSAP     

Limited Use Documents

Quarterly Progress Reports and Attachments are furnished only for review by members of the NCHRP project panel and are regarded as fully privileged.  Dissemination of information included herein must be approved by NCHRP.  All files on this page are password protected.  If you need access to one of these documents email mac@roadsafellc.com.

 

 

 

 

                                           

 

Quick Links

Quarterly Progress Reports

Malcolm H. Ray, P.E., Ph.D.

RoadSafe LLC
P.O. Box 312

12 Main Street
Canton, Maine 04221
mac@roadsafellc.com
Phone: +1-207-514-5474

 

 

 

 

 

 

 

 

 

 September 2011 Quarterly Report.

             Attachment A: Progress and Fiscal Summary

             Attachment B: Responses to Panel Comments

             Attachment C: Adjustment Factors for Roadside Encroachments

             Attachment D: The Application of the Probability of Injury Method in RSAP

             Attachment E: Benefit-Cost Analysis of Median Alternatives: Example

             Attachment F: Estimating Crash Costs in RSAP

            

 June 2011 Quarterly Report.

             Attachment A: Progress and Fiscal Summary

             Attachment B: Responses to Panel Comments

             Attachment C: Encroachment Rates and Characteristics

             Attachment D: Updated Severity Indices

             Attachment E: Penetration of Features

             Attachment F: Driver Input and Curvilinear Paths

             Attachment G: RSAP 2010 Benchmark Cases

             Attachment H: Median Barrier Alternatives Example: Hand Calculations

 

March 2011 Quarterly Report.

             Attachment A: Progress and Fiscal Summary

             Attachment B: Responses to Panel Comments

             Attachment C: Draft RSAP 2010 User’s Manual

             Attachment D: Encroachment Model Updates Documentation -- Introduction

             Attachment E: Adjustment Factors for Motorcycles and Truck Crash Costs

             Attachment F: Hazard Penetration Considerations

             Attachment G: Analysis of Trajectory Paths from the 17-22 Data

             Attachment H: Grid Method for Estimating Probability of a Collision

 

December 2010 Quarterly Report.

             Attachment A: Progress and Fiscal Summary

             Attachment B: Responses to Panel Comments

             Attachment C: Probability of Injury Approach in RSAP 2010

             Attachment D: Example and Benchmark Cases

 

September 2010 Quarterly Report.

             Attachment A: Progress and Fiscal Summary

             Attachment B: Responses to Panel Comments

             Attachment C: Work-In-Progress Programmer’s Manual

             Attachment D: Work-In-Progress Loop-Up Table Specifications

            

June 2010 Quarterly Report.

             Attachment A: Progress and Fiscal Summary

             Attachment B: Responses to Panel Comments

             Attachment C: Work-In-Progress Programmer’s Manual

             Attachment D: Work-In-Progress User’s Manual

             Attachment E: Encroachment Angle Distribution_2ln Undivided

             Attachment F: Encroachment Angle Distribution_4ln Divided

             Attachment G: Encroachment Distance Distribution_2ln Undivided

             Attachment H: Encroachment Distance Distribution_4ln Divided

             Attachment I: Encroachment Rates_2ln Undivided

             Attachment J: Encroachment Rates_4ln Divided

 

March 2010 Quarterly Report.

                 Attachment A: Progress and Fiscal Summary

                 Attachment B: Responses to Panel Comments

                 Attachment C: Work-In-Progress Programmer’s Manual

                 Attachment D: Cooper Re-Analysis Figures

                 Attachment E: RSAP Excel Spreadsheet for RDG Example

                 Attachment F: Instructions for RSAP Excel Spread Sheet

                 Attachment G: RDG Example Problem

 

December 2009 Quarterly Report.

                 Attachment A: Progress and Fiscal Summary

                 Attachment B: Draft Interim Report with Work Plan

                 Attachment C: RSAP Overview Presentation

                 Attachment D: RSAP Work Plan Flow Chart

                 Attachment E: RSAP Work Plan Overview Presentation

                 Attachment F: RSAP Monte Carlo Simulation and Scaling Framework

                 Attachment G: RSAP Survey Results Presentation

                 Attachment H: Comparison of RSAP and IHSDM CPU (HSM)

                 Attachment I: RSAP User Interface Presentation

                 Attachment J: RSAP Program Flow Chart

             Attachment K: RSAP Model and Data Issues Presentation

 

September 2009 Quarterly Report.

                 Attachment A: Progress and Fiscal Summary

             Attachment B:  Draft Interim Report

 

June 2009 Quarterly Report.

                 Attachment A: Progress and Fiscal Summary

                 Attachment B: Presentation Slides from AFB20 Summer Meeting

                 Attachment C: Survey Results Summary

                 Attachment D: Draft Literature Review

 

March 2009 Quarterly Report.

                 Attachment A: Progress and Fiscal Summary

                 Attachment B: Preliminary Draft of the Literature Review